What we need to consider

When looking at how North Red Lodge could be designed, we have taken a wide variety of different aspects into account.

These include:

  • Opportunities to create new homes, jobs and local facilities
  • Connections with the rest of the village
  • Giving the school space to grow
  • The A11, including how to deal with traffic noise
  • A gas pipeline that runs beneath the site
  • Environmental constraints – to reduce recreational pressure in nearby sensitive areas by providing lots of green space on site
  • The local landscape and ecology – possible impacts plus how to retain and enhance existing wildlife and landscape features
  • Public transport
  • Sustainable urban drainage
  • Archaeology
  • The gentle sloping nature of the site
  • The character of the local area, including the architecture
  • Views into and out of the site

Many of these are shown on the plan below.

Constraints and Opportunities plan - a larger version is available in the Document Library

Find out more

A larger version of the Constraints and Opportunities plan can be found on page 17 of the masterplan document, which available in the Document Library on this page.

When looking at how North Red Lodge could be designed, we have taken a wide variety of different aspects into account.

These include:

  • Opportunities to create new homes, jobs and local facilities
  • Connections with the rest of the village
  • Giving the school space to grow
  • The A11, including how to deal with traffic noise
  • A gas pipeline that runs beneath the site
  • Environmental constraints – to reduce recreational pressure in nearby sensitive areas by providing lots of green space on site
  • The local landscape and ecology – possible impacts plus how to retain and enhance existing wildlife and landscape features
  • Public transport
  • Sustainable urban drainage
  • Archaeology
  • The gentle sloping nature of the site
  • The character of the local area, including the architecture
  • Views into and out of the site

Many of these are shown on the plan below.

Constraints and Opportunities plan - a larger version is available in the Document Library

Find out more

A larger version of the Constraints and Opportunities plan can be found on page 17 of the masterplan document, which available in the Document Library on this page.